| Check | Work Document Number | Length Of Perimeter (Metre) | Width Of Perimeter (Metre) | Area Of Perimeter (Square Metre) | Height Of Perimeter (Metre) | Volume Of Material For Slab (Cubic Metre) | Radius Of Column (Metre) | Length Of Column (Metre) | Volume Of Material For Column (Cubic Metre) | Sum Ratio Of The Mix | Number Bags Of Cement For Slab | Number Bags Of Cement For Column | Weight Of Steel Rods For Slab(Kilogram) | Weight Of Steel Rods For Column(Kilogram) | Number Of Workers For Slab Per Shift | Number Of Workers For Column Per Shift | Author | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Check | ZYNTEC.01.OPS.ENG.CN.02.R0.Work Quantity Survey Calculation Note | 5.00 | 6.00 | 30.00 | 2.00 | 60.00 | 4.00 | 45.00 | 2260.80 | 4.00 | 745.48 | 28089.76 | 4800.00 | 361728.00 | 248.49 | 9363.25 | Koton Okpo Usani |